Browse by Tags: seg deliverable

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Number of items: 1.
  1. [img]
    SEG Deliverable 4: Application Increment 3
    This is the specification for the 4th deliverable of the Agile Software Engineering Group Project. The 4th deliverable is code increment 3 of the application built in the 3rd sprint

    Shared with the University by
    Dr Yvonne Howard
This list was generated on Sun Dec 22 12:12:34 2024 UTC.